Installation of 100 TR VRF System

The supply and installation of a 100TR VRF system at PCB ensures an energy-efficient, reliable, and modern climate control solution, tailored to meet the organization’s needs.

Energy Producers Ltd
Industrial Chemicals
11 December, 2020
$5700

Overview Projects

The project involved the supply and installation of a 100-ton Refrigeration (TR) Variable Refrigerant Flow (VRF) system for the Pakistan Cricket Board (PCB). This advanced HVAC solution is designed to deliver superior climate control, ensuring optimal comfort for staff, players, and visitors. The system combines cutting-edge technology with energy efficiency to align with modern sustainability goals.

This VRF system is designed to offer precise temperature control across different zones, reducing energy consumption and operational costs while promoting sustainability. The project stands as a testament to innovative engineering and commitment to delivering high-quality solutions in the education sector.

“There is one rule for industrialists and that is: Make the best quality of goods possible at the lowest cost possible, paying the highest wages possible.”

Joel Alexander – CEO & Founder Ondustry

The installation process included:

  • The installation process for the 100TR VRF system at PCB involved site preparation, equipment placement, refrigerant piping, and electrical integration. It was followed by system testing, commissioning, and training for the facility management team.
Did you like this Work? Please Share